Login

Made by Samsung, Shell's Prelude is an Empire State Building on water

Shell Prelude

Stretching further than the length of four football fields, weighing over 600,000 tons, and designed to withstand category 5 cyclones, Shell's latest construction project is the definition of grand scale engineering. Called the Prelude, it's a massive Floating Liquefied Natural Gas (FLNG) processing facility, which this week lived up to its name by being floated out of its production dock in South Korea. It's still being built, with only the vast red hull making its way out to sea for the moment, but it's already a staggering sight to behold. Samsung Heavy Industries is responsible for the Prelude's construction, showing just how versatile and varied the Korean chaebol's operations are.

Shell-comparison

At 488 meters, the Prelude is longer than the height of most skyscrapers

Once everything is up and running, the Prelude will be towed south to the northern coast of Australia, where it's planned to operate for a period of 25 years. Extracting gas from offshore reserves, the FLNG will shrink its volume 600 times by a chilling process that reaches a frosty minus 162 degrees Celsius. From there, it'll load it directly onto ocean-going cargo ships for distribution around the world.

The Verge
X
Log In Sign Up

forgot?
Log In Sign Up

Forgot password?

We'll email you a reset link.

If you signed up using a 3rd party account like Facebook or Twitter, please login with it instead.

Forgot password?

Try another email?

Almost done,

Spinner.vc97ec6e

Authenticating

Great!

Choose an available username to complete sign up.

In order to provide our users with a better overall experience, we ask for more information from Facebook when using it to login so that we can learn more about our audience and provide you with the best possible experience. We do not store specific user data and the sharing of it is not required to login with Facebook.